Cabra Hills, Update

Work on the excavation of the former CIE site on the Cabra Road for the construction of 420 apartments will continue until November 2019.

In response to Mary’s representations on behalf of surrounding residents on Quarry, Cabra and Carnlough Roads Walls Construction made the following commitments:
• No works will commence on site before 7am
• Dust control measures implemented including tractor and water bouser full time on site and dedicated road sweeping operation on Cabra/Navan road
• Rentokil have been engaged to set up bait stations on site
• Working hours will be strictly restricted to between 7.00am – 7pm Mon – Fri, 8.00am – 2pm Sat
• Daily there are currently on average 24 trucks on turn around. This equates to approximately 100 loads per day. The quantum of trucks will be reduced when the schools return due to increased traffic volumes
• Construction will commence in October 2019
• The developer, Royalton Group intends making an application under the SHD planning process to An Bord Pleanala to “amend the volume of units and make enhancements to both the external appearance and the volume of amenity spaces. The increased density of the development will be achieved through a re configuration of the layouts and not any increase in scale or height to the current scheme”

Mary has asked the developer to make the details of their revised planning application available to the public on the web.

The main point of contact for the site is Ollie Conway, senior engineer. Email : ollie.conway@walls.ie or Tel : 0860237480

Share:

More Posts

Neurological Conditions

Mary is proud to support the Neurological Alliance of Ireland and has pledged to make brain health a priority. Mary is the first general election candidate to NAI’s pledge of mplementing existing national strategies for neurological conditions, delivering on Ireland’s commitment under article 26 of the UNCRPD to provide comprehensive

Read More »

General Election 2024

General Election 2024 will take place on Friday, November 29th. Mary is Fianna Fáil’s candidate in Dublin Central. Mary needs your vote to ensure we have a stable government and a growing economy so we can invest in improving our public services.  That means building more homes, safer, cleaner streets,

Read More »

Apartment Defects

Government is advancing an apartment defects remidiation scheme by working with stakeholders to develop a streamlined process for handling these costs. The pilot process aims to create a practical and transparent model for the wider rollout of the scheme to fund essential apartment remediation works. Minister Darragh O’Brien will present findings

Read More »

Whitehall Special School

A new permanent school building for An Cosán Community Special School is to be included in the state’s largest ever multi-school campus at Whitehall.  The Special School is currently operating from an interim location at Grangegorman but will be given a new home on the multi-school campus beside Clonturk Community College, Ellenfield Community College and Gaelscoil Áine at Whitehall.  This

Read More »

Join Mary's Newsletter

Quick Links

Home

About

Latest

Donate

Privacy Policy

Contact Details

© All rights reserved

Website by The Website Shop