Cabra Hills, Update

Work on the excavation of the former CIE site on the Cabra Road for the construction of 420 apartments will continue until November 2019.

In response to Mary’s representations on behalf of surrounding residents on Quarry, Cabra and Carnlough Roads Walls Construction made the following commitments:
• No works will commence on site before 7am
• Dust control measures implemented including tractor and water bouser full time on site and dedicated road sweeping operation on Cabra/Navan road
• Rentokil have been engaged to set up bait stations on site
• Working hours will be strictly restricted to between 7.00am – 7pm Mon – Fri, 8.00am – 2pm Sat
• Daily there are currently on average 24 trucks on turn around. This equates to approximately 100 loads per day. The quantum of trucks will be reduced when the schools return due to increased traffic volumes
• Construction will commence in October 2019
• The developer, Royalton Group intends making an application under the SHD planning process to An Bord Pleanala to “amend the volume of units and make enhancements to both the external appearance and the volume of amenity spaces. The increased density of the development will be achieved through a re configuration of the layouts and not any increase in scale or height to the current scheme”

Mary has asked the developer to make the details of their revised planning application available to the public on the web.

The main point of contact for the site is Ollie Conway, senior engineer. Email : ollie.conway@walls.ie or Tel : 0860237480

Share:

More Posts

New National Drugs Strategy

Minister for Drugs Jennifer Murnane O’Connor recently updated me in Seanad Eireann on the new national drugs strategy. Her new strategy is designed to respond to the significant changes in drug-use patterns in Ireland and to ensure equitable access to services across the country. The draft strategy proposes five strategic

Read More »

Teach An Saol

It is truly great news that Teach an Saol’s proposal for a dedicated National Neuro‑Rehabilitation Centre was granted planning permission by Dublin City Council 9 January 2026. This is a huge achievement. Well done to Padraig’s family and everyone who has contributed and supported this amazing project. The project received

Read More »

Scrambler Ban, Grace’s Law

As Fianna Fáil Spokesperson for Dublin I am working with Minister for Justice Jim O’Callaghan to make Dublin safer. Following unanimous support for my motion, calling for an out-right ban of scramblers at the Fianna Fáil Parliamentary Party, Government have announced Graces Law will be enacted. Graces Law will ban

Read More »

Cabra Dart+

In the Seanad I asked the Minister for Transport  to prioritise funding for the DART+ South West project to progress. I highlighted the strong case for a new station in Cabra noting that approximately 26,000 people living in the area will benefit from reduced car usage, better commuting time and

Read More »

Join Mary's Newsletter

Quick Links

Home

About

Latest

Donate

Privacy Policy

Contact Details

© All rights reserved

Website by The Website Shop